A Chronological Overveiw of Creating A Custom Home
Project Objective:
- Choose a suitable building site.
- Your builder and/or architect will guide you through the process of defining the conceptual project objective. This consists of setting a preliminary budget as well as determining the approximate size, architectural style and unique features of your project.
Design:
- Select a design source to develope your design concept into working drawings:
- Stock plan.
- Redesign an existing plan.
- Exercise the service of our affiliate architect through custom design.
- Pursue the expertise of an architect of your preference.
Design Completion:
- It is now time for the pre-estimate meeting. You and the builder will review interior trim options and discuss the types of materials and products that budgeting should allow for.
- As your construction drawings are finalized, they are thoroughly examined with attention to structural and aesthetic detail. All specifications are made and the cost to construct calculated.
- A proposal will be presented clarifying materials and products to be used along with the allowances that have been provided. Any requested alterations are then made.
- For "selection" items a "recommended vendor list" will be provided, which indicates: showroom location/contact information and a general description of the items you will be shopping for at each location.
- At this point, permit applications and any architectural review board proposals are submitted.
Construction Process:
- Once all permits and approvals have been obtained, construction typically takes five to seven months.

- The lot is cleared, foundation built and framework for your house erected. If building long distance, through out the process you will receive periodic pictures and progress reports
- Now it is time for the framing walk-through. This also marks the deadline for most of your selections to be finalized.
- The mechanicals are roughed-in, the insulation installed and the sheetrock hung then finished.
-
Another formal walk-through at this point is optional, but any remaining selections must be confirmed.
-
The trim process is under way. Your home receives the carpentry, cabinetry, paint, flooring, fixtures, hardware and appliances.
- The finishing touches are put on your home, it is then cleaned and the landscaping installed.
Final Phase:
- A Certificate of Occupancy is issued by the Building Department
- A final walk-through is conducted by the builder and client, after which any remaining details are attended to.
- The last step is "the closing" which begins the warranty period
For your convenience a complete construction glossary
|
|
Is there a construction project in your future that you would like to bring to our attention? Please, send us an inquiry.
Suggest this site to a friend
We appreciate any questions or comments you may have,
so drop us a line.
703 Princess Street • Wilmington, NC 28401
Phone: (910) 762-6966 • Fax: (910) 762-6544
Copyright © 2002-2008 Art Davis Construction All Rights Reserved.
Powered by PD-go!
|
|